Rewinding the slip ring device (Fig 3–5)
 
05
 
07
 
09
After the first draw, the serpentine pipes reached a total length of approx. 14–16 m.
 
11
 
13
 
15
 
17
 
19
 
21
The interior right pipe will be fastened to the serpentine pipe with 4-5 cable clamps.

The injection pipe for jointing will be later on easily mounted in the free round space.
 
23
The integrated and the default additional weight facilitate the submersion of the unfilled ground probe.
 
02
Pulling out the tie bands from the tubular slip ring.
 
04
 
06
The serpentine pipes are being pulled out.
The person located at the end of the probe
holds tight the margin and a second person pulls from the other end of the probe.
(Fig. 6-8)
 
08
 
10
Now the spiral pipe sections will be deployed.

(Fig. 10-20)
 
12
 
14
 
16
 
18
 
20
 
22
The Probe is ready
 